Client
Transport for London (TfL)
Timeline
2021 - 2022
Context
SRC partnered with TfL to develop an innovative cooling solution for the Piccadilly Line Upgrade. The trial addressed rising platform temperatures driven by increased service frequency and air-conditioned trains, requiring a scalable, low-maintenance alternative to traditional cooling systems.
Project Services
- Mechanical Engineering
- Design & Prototyping
- Systems Integration
- Innovation Delivery
Transforming Underground Cooling
The solution delivered measurable improvements in passenger comfort while significantly reducing long-term operational costs. By combining innovative design with efficient manufacturing, SRC helped create a system that not only outperformed traditional approaches but also offered a scalable model for wider network deployment.
The trial demonstrated how targeted engineering innovation can unlock both sustainability and performance benefits across legacy infrastructure.
The SRC Approach
Innovative Design
Developed aluminium extrusion system to eliminate dust clogging and reduce maintenance.
Performance Testing
Delivered live trials demonstrating measurable temperature reduction on active platforms.
Whole-Life Thinking
Designed solution to minimise operational and maintenance costs over 40 years.
System Integration
Ensured compatibility with existing LU infrastructure and upgrade programme.
UK Manufacturing
Partnered with specialist Chesterfield manufacturer to deliver high-quality fabrication.
Scalable Solution
Created modular system adaptable for wider rollout across metro environments.
“After years of being a Londoner and commuting on the tube, I am delighted to be part of this brand new tech solution designed to cool the airflow on platforms which will vastly improving the travel experience for passengers like me”.
